Illustrative structure · Bank construction loan + C-PACE

$24M 120-unit ground-up apartments

A developer with land and entitlements for a 120-unit apartment project needs construction financing with a clear permanent exit.

Illustrative example. Structures shown are illustrative examples of how these programs are typically arranged. They are not client testimonials or guarantees of results; actual terms vary by borrower, asset, and market. This is not a closed transaction and not an offer or commitment to lend.

Why this structure

  • A bank construction loan is usually the lowest-cost senior debt for an experienced developer. It is modeled at up to 65% of total cost and no more than 65% of the as-completed value.
  • California C-PACE can pay for qualifying energy, water and seismic improvements, modeled at up to 25% of project cost at a fixed rate over about 25 years. That reduces the equity the developer has to bring, if the bank consents.
  • The bank sizes the loan against the permanent exit: stabilized income has to support a 9% debt yield and 1.25x DSCR, so the takeout is tested before the construction loan closes.

Program parameters used

Taken from the sizer's assumptions, reviewed 2026-10-31. Programs change by notice; an advisor confirms current rules before you rely on any figure.
Bank max loan-to-cost
65%Modeled assumption, reviewed 2026-10-31; confirm with the lender.
Bank max loan-to-value, as completed
65%Modeled assumption, reviewed 2026-10-31; confirm with the lender.
Bank spread
SOFR + 3.125%Indicative; set by the lender.
Min debt yield at stabilization
9%Modeled assumption, reviewed 2026-10-31; confirm with the lender.
Min DSCR at stabilization
1.25xModeled assumption, reviewed 2026-10-31; confirm with the lender.
C-PACE share of project cost
Up to 25%Senior lender consent required. Modeled assumption, reviewed 2026-10-31; confirm with the lender.
C-PACE term
25 years, fixedModeled assumption, reviewed 2026-10-31; confirm with the lender.

Timelines are typical ranges after a complete file and are subject to lender approval, appraisal, title, and diligence. They are not guaranteed.

How it typically unfolds

  1. Step 1

    Test the exit first

    The advisor sizes the permanent loan on projected stabilized rents and expenses, then works backward to a construction loan the takeout can repay.

  2. Step 2

    Size the budget and reserve

    Hard and soft costs, contingency, the developer fee and the interest reserve are budgeted together so the loan, C-PACE and equity cover the whole plan.

  3. Step 3

    Place the construction loan and C-PACE

    The bank funds the loan as lender of record and controls every funding during construction. Corin never holds or moves loan funds.

  4. Step 4

    Lease up and refinance

    After completion and lease-up, the property is underwritten for a permanent loan, such as an agency, HUD or bank loan, that repays the construction loan.

What a lender will look at closely

  • Senior-lender consent to C-PACE, because the assessment is collected with property taxes and ranks ahead of the mortgage.
  • Cost overruns against the contingency, and who covers them if the contingency runs out.
  • Floating-rate exposure during construction and the rate cap the bank requires.
  • Whether lease-up reaches the rents and occupancy the takeout lender needs to pass its DSCR and debt-yield tests.

All rates, terms, and sizing are indicative estimates for discussion only, are not a commitment to lend, and are subject to lender underwriting, appraisal, credit approval, and program guidelines in effect at application. Corin Commercial arranges loans as a licensed California real estate broker and is not the lender. Corin Commercial, Inc. · Real estate broker, California Department of Real Estate · CA DRE Corp. License #01522444 · Designated Officer: Neeli Khanna